Railway Bob's Module Building Tips

Some infrequent tips and tricks that will take some of the headaches away when you are building your model railroad modules or layout

Making Bragdon Geodesic Foam Castings

›
ROCK CASTINGS - OVERVIEW Read the instructions first!  This is a multi-step process.  You have about 30 minutes from start-to-fini...
1 comment:

Installing The Bell Module To The Level Crossing

›
In a previous post , the dynamic duo, Colin C and me, installed Custom Signals Grade Crossing GCF-1 module, along with NJ International'...

The Peco Electrofrog - Circuitry

›
The electrical routing of the Peco Electrofrog is as different from the Insulfrog as day is to night.  I wouldn't even try to compare th...
6 comments:

Grade Crossing Signals For HO & N-Scale

›
While Colin C and I were at the Springfield train show in January of 2010, Colin expressed an interest in getting some grade-crossing signa...

Installing RJ12 Telco Jacks - Part 3 Installing The First Telco Jack

›
Now that we have the first telco jack wired up, we are ready to install it into the module frame.  Stuff both of the cables through the cuto...

Installing RJ12 Telco Jacks - Part 2 - Soldering The First Telco Jack

›
Now that we have our telco jack and two cables securely taped to our jig, we're ready to start soldering the wires together - white-to-w...

Legs For The Modules

›
How Long Are The Legs? So far, we have a module that can only sit on the floor.  We need to fabricate some legs so that we can get the mod...
›
Home
View web version
Powered by Blogger.